Total Pageviews

Thursday, 19 May 2011



We started off by conducting a the portotype of the tube connected to the bowl to test and operate how this machine will operate.
This is the our final concept design that we will be using in this project. We have encounter in some areas of this design were we had difficulty in finding the best position for the speakers and for the laptop. We structured the laptop design in the this design. We struggled to integrate the the laptop into the construction piece. We have the bowl situated in the lowest part of the construction item. reason being this is so that it can pick up all the vibrating sounds in the city.

No comments:

Post a Comment